Slideshow-1 Slideshow-2 Slideshow-3 Slideshow-4

Other Info


Bronx Gallery Random Image

Bronx Gallery Random Images

Talk Network
Delaware Chat
Pennsylvania Forum
Ohio Forum
New York Chat



MTA Planning | NYC Select Bus Service

sbs_header.jpg

Project Description

The MTA New York City Transit (NYCT), the New York City Department of Transportation (NYCDOT), and New York State Department of Transportation (NYSDOT) are planning to introduce Select Bus Service (SBS) to New York. SBS will utilize innovative bus rapid transit elements that will improve the speed and reliability of bus service on the implemented routes.

Goals and Objectives

SBS Benefits Include:

  • A new high performance transit option for NYC.
  • Improve the speed, reliability and appeal of the bus system, city-wide.
  • Provide measurable benefits to current customers as well as attracting new riders and supporting growth and redevelopment.

The goals of the study are:

  • Identify the opportunities for SBS in NYC with the greatest potential benefits and the highest probability of successful implementation.
  • Move a comprehensive, cost-effective city-wide SBS demonstration program into implementation.
  • Improve those corridors not selected for the SBS demonstration by using techniques identified by the study.

Project Phases and Schedule

The first SBS corridor, Fordham Rd-Pelham Parkway  is expected to be implemented in the summer of 2008.

Major Planning Activities Include:

  1. Identify strategic issues relating to SBS implementation in NYC;
  2. Based on U.S. and world-wide experience, identify the range of SBS improvements that might work well in NYC;
  3. Identify and evaluate all candidate corridors with SBS potential in New York City;
  4. Select the 15 corridors with the highest probability of success and potential benefit; Project Update
  5. Develop a preliminary concept plan for each corridor tailored to the market and physical environment in that corridor;
  6. Select the best corridors and develop more detailed plans while identifying improvements that can be implemented elsewhere.
  7. Comprehensive Project Reassessment.
  8. Preparation of detailed plans for Fordham Road-Pelham Parkway Corridor.
  9. Implementation of Fordham Road-Pelham Parkway Corridor.
 

1 Star2 Stars3 Stars4 Stars5 Stars (No Ratings Yet)
Loading ... Loading ...
Email This Post Email This Post





Riders Will Pay Before Boarding, and Save Time, on Revamped Bus Route

Riders Will Pay Before Boarding, and Save Time, on Revamped Bus Route

Beginning on Sunday, passengers on a revamped bus route in the Bronx and Upper Manhattan will pay their fares before they get on the bus, as part of a series of innovations intended to allow faster travel.

The time it takes to cross the Bronx on the upgraded Bx12 route should eventually drop by 20 percent under the new system, said Ted V. Orosz, the director of Manhattan and Bronx bus service planning for New York City Transit.

The new service will replace the Bx12 Limited, which took 58 minutes at midday on a weekday (when traffic is usually heavy) to travel the full seven-mile length of the route, from Co-op City in the Bronx to 207th Street and Broadway in Upper Manhattan. The buses travel for long stretches on Pelham Parkway and Fordham Road, across the heart of the Bronx.

Officials hope to ultimately shave 10 or 12 minutes off that trip. But the initial schedule does not reflect such large savings. The transit agency has scheduled the new buses to make the midday trip in 55 minutes, just three minutes quicker than before. But more buses are being used on the route, so at the busiest times buses will run from four to eight minutes apart.

Officials said that they would monitor the route closely and that they expected to see increasing improvements in time.

Mr. Orosz said he expected 25,000 people a day to use the new service at the start, with the number growing as more people become familiar with it.

“It looks cooler, it’s faster, it will run a little more frequently,” he said. “All those things should increase ridership.”

The new service, called Select Bus Service, will save time mostly by requiring riders to pay fares before they get on the bus, using coins or swiping their MetroCards at curbside machines at each stop.

The idea is to cut boarding times by eliminating the lines that often form at the front door of a bus while passengers wait to swipe or pay. That wait is a primary factor in slow travel times for buses.

There will be more than one machine at each stop, to keep lines from developing there. The machines will provide receipts, and when the bus arrives, passengers may board either in the front or the back, with no need to show the receipt to the driver or to swipe again.

To keep people honest, inspectors will ride the buses and ask passengers for their receipts. If a passenger does not have one, the inspectors may give them a $100 ticket for fare-beating. Officials said that during the first week, while passengers are adjusting to the system, the inspectors will hand out warnings instead.

The route will have other innovations as well.

The Fordham Road part of the route will have computerized traffic signals that communicate with the buses, helping them by holding a green light or shortening a red light by up to 15 seconds as a bus approaches.

And the stretch of the route along Fordham Road and 207th Street will have dedicated bus lanes painted in red with overhead signs telling other vehicles to stay out of the lane on weekdays from 7 a.m. to 7 p.m.

What the route’s buses will not have are cameras mounted on the front to take pictures of cars and trucks encroaching on the bus lane. Legislation pushed by Mayor Michael R. Bloomberg to allow for such cameras was blocked in committee in the State Assembly.

“It hurts bad,” said Mr. Orosz of the absence of the bus cameras. “That would have been a huge lift, a huge improvement in the bus lane.”

Instead, the police will patrol the route to keep other vehicles away.

The buses, all articulated models, with two carriages connected with accordianlike devices, will look a little different too, decorated on the outside with a wavy blue pattern covered with blue plus signs. Inside, the seats are covered in a blue polka dot fabric.

Read more..

 

1 Star2 Stars3 Stars4 Stars5 Stars (No Ratings Yet)
Loading ... Loading ...
Email This Post Email This Post





City Reaches Out to Bronx On New BRT Route

City Reaches Out to Bronx On New BRT Route

bx12_route.jpg

NYC DOT and NYC Transit have begun presenting at Bronx community boards to help promote the June 29 launch of NYC’s first bus rapid transit route along Pelham Parkway and Fordham Road in the Bronx. The new service, known as Select Bus Service, has distinct features that will make riding the bus a new experience for transit riders along the corridor.

As MTR wrote earlier, Select Bus fares will be paid under a “proof of payment” system where riders would pay at stations and show a receipt if asked by on-board fare collectors. This will shorten delay caused as passengers pay one by one at the head of the bus.

Read more..

 

1 Star2 Stars3 Stars4 Stars5 Stars (No Ratings Yet)
Loading ... Loading ...
Email This Post Email This Post





Buses Bloom In The Bronx

Buses Bloom In The Bronx

bus_after-crop.jpg

Bx12 Select buses greeted attendees of the “Buses in the Boroughs” symposium Tuesday morning.

With spring colors and fragrance in full bloom at the New York Botanical Garden Tuesday morning, TSTC along with Transportation Alternatives, the Straphangers Campaign, and the Pratt Center for Community Development hosted a symposium on bus rapid transit to showcase how this transit option has transformed major cities around the world and to preview New York’s plans for BRT throughout the five boroughs.

Walter Hook and Oscar Edmundo Diaz, both of the Institute for Transportation & Development Policy, discussed BRT systems in nearly two dozen cities around the world (both presentations are available on TSTC’s website). Hook’s presentation spanned multiple systems and highlighted some technical “dos and don’ts” for BRT providers (such as the advantages of median bus lanes, the need for multiple-door buses, how to fit BRT into narrow streets, etc.). His presentation drew on the broad and detailed knowledge of ITDP, which consults governments around the world in planning BRT systems and produces an 850-page BRT Planning Guide.

Diaz, a native of Colombia and a specialist in urban transport systems, focused on what many consider the world’s most successful BRT system, the TransMilenio of Bogota, Colombia. TransMilenio can carry up to 42,000 passengers per hour per direction and travels an average 18.1 mph, more than twice as fast as the average bus in NYC. It is top-of-the-line BRT, with pre-boarding fare collection, level boarding at platforms, and enclosed stations — a worthy transit system for a city of 7 million. Of course, the quickest way to get a sense of TransMilenio is through pictures:

transmilenio.jpg

Clockwise from top left: TransMilenio in dense urban areas, level boarding between bus and station platform, fare collection at turnstiles (not on the bus), interior of a TransMilenio bus.

Diaz emphasized how a well-built system can dramatically improve the lives of commuters and residents who lack transit access, and as a result, economic and social opportunity. While 21% of TransMilenio riders own cars, the system is also accessible to low-income commuters, mothers with children in tow, the handicapped, and the elderly. In surveys, the #1 reason TransMilenio riders said they liked the system was because it allowed them to spend more time with their families. Read more..

 

1 Star2 Stars3 Stars4 Stars5 Stars (No Ratings Yet)
Loading ... Loading ...
Email This Post Email This Post





Millions of Jobs of A Different Collar

326collar4502.jpg

RAISING THE ROOF James Wells of Sustainable South Bronx, a nonprofit group that plants vegetation in the area, working on a Bronx rooftop garden.26collar600.jpg

NEW LABOR Jim Albert, a technician for General Electric, climbing to the top of a wind turbine in Sweetwater, Tex., where the turbines stand as tall as 20-story buildings.

 

Millions of Jobs of A Different Collar

EVERYONE knows what blue-collar and white-collar jobs are, but now a job of another hue — green — has entered the lexicon.

Presidential candidates talk about the promise of “green collar” jobs — an economy with millions of workers installing solar panels, weatherizing homes, brewing biofuels, building hybrid cars and erecting giant wind turbines. Labor unions view these new jobs as replacements for positions lost to overseas manufacturing and outsourcing. Urban groups view training in green jobs as a route out of poverty. And environmentalists say they are crucial to combating climate change.

No doubt that the number of green-collar jobs is growing, as homeowners, business and industry shift toward conservation and renewable energy. And the numbers are expected to increase greatly in the next few decades, because state governments have mandated that even more energy come from alternative sources.

Read more..

 

1 Star2 Stars3 Stars4 Stars5 Stars (No Ratings Yet)
Loading ... Loading ...
Email This Post Email This Post